Images 1

— From the California High-Speed Rail Authority

Installing four-quadrant gate systems at Main Street and Voorheesville Avenue in the village would allow engineers to not have to blow their whistles as they travel past the two crossings as the quad gates are designed to block all lanes of traffic on both sides of the track. The village is now into its second decade trying to get the gate systems installed.